LEARN / RESEARCH FOUNDATIONS

Work through risk, probability, market structure and the practical limits of trading statistics.

Explore the Research Tools ↗
AI-generated hand annotating fictional market research charts
AI-generated image

04 / LEARNING CENTER

Know the downside before the entry.

Risk literacy is a better starting point than predictions. Learn how to frame loss, understand a stop and question the assumptions behind projected reward.

RESEARCH FRAMEWORK

A transparent position-sizing example

Educational illustration only — not a recommendation or a live trading calculation.

STEP / 01

Choose planned risk

Hypothetical account $10,000; illustrative 1% planned risk = $100.

STEP / 02

Define price distance

Hypothetical stock entry $40 and stop $38 gives $2 nominal risk per share.

STEP / 03

Calculate exposure

$100 ÷ $2 = 50 shares before commissions, slippage, gaps or instrument constraints.

A 2R target is not a promise.

A theoretical 2R opportunity is twice the initial planned risk in possible gain before costs. Whether it is attractive depends on probability, execution, market regime and portfolio exposures. Even with a stop, losses can exceed the planned amount.

Performance methodology →

Learn to evaluate the whole process.

Planned learning modules include market regimes, volatility, correlations, signal status, position sizing and backtest limitations.

Trading can result in significant financial loss. These materials are educational and not personalized investment advice. There are no verified live signals or automatic executions available on this site at this stage.

SITEWIDE / RESEARCH CONNECTIONS · PRACTICE WITH EXAMPLES

Use the formulas, then question the assumptions.

FROM FOUNDATIONS TO DESK RESEARCH

A structured learning path for serious traders

Start with capital risk, continue through costs and recordkeeping, then challenge a strategy with regime splits, correlated risk and truly unseen data. Learn how to say ‘insufficient evidence’.

Risk and sizing fundamentals

A practical starting point with worked stop-size math.

Professional Research Library

Twelve advanced and specialist research routes.

Stop-loss research guide

Design around invalidation rather than an arbitrary stop distance.

Trading fees and slippage

Understand what the net result must subtract.

Trading journal guide

Record decisions, negative outcomes and all changes.

Strategy validation

Avoid hindsight and parameter-selection traps.

All numerical examples are illustrative, not forecasts or individualized financial advice.

FREE LEARNING PATH / SIX LESSONS

Trading Research Foundations

A practical course for understanding trade planning, uncertainty, sizing, volatility, transaction costs and review. Each lesson includes an example, a question to check your understanding and a direct link to a free calculator. Complete the exercises with hypothetical data before applying the method to real decisions.

6 lessonsSelf-pacedNo account requiredIllustrative examples only
01Build a thesis that can be wrong

A trade thesis is an explanation of what may happen and why. A trading signal is not evidence on its own. Before looking at the potential profit, write down the market condition, the event or data you are using, and what new observation would prove your idea wrong. A useful thesis has an expiry: conditions change, and old assumptions should not silently become permanent forecasts.

Worked example. You think a fictional market could consolidate above a previous range boundary. The hypothesis is a continued range; the alternative is a sustained break below it. Define both the observation and its time frame. If the invalidation occurs, the idea changes or expires; do not move the boundary merely because the position is uncomfortable.

Practice: In three sentences, describe a hypothetical setup, one counter-scenario and the observation that would invalidate the setup. A useful self-check: could another reader tell you, without guessing, when your idea is no longer valid?

Write a research note ↗Practice a Guided Decision Case ↗
02Calculate a risk budget before position size

Position size starts with a loss budget, not a preferred number of lots. Specify account equity, a hypothetical percentage risk, entry and stop price, and the contract specifications. First calculate your currency risk: account size multiplied by risk percentage. Then divide it by loss per unit including the proper contract multiplier, currency conversion and expected costs. Rounding to the allowed contract increment may reduce the permissible size.

Worked example. A hypothetical $10,000 account with a 1% risk budget allows $100. If the planned entry is 100 and the stop is 95, that is five price units per instrument unit. With a one-to-one contract multiplier and no fees, the mathematical size is 20 units. This does not automatically equal 0.20 forex lots; lot size depends on the instrument, pip value, contract size and quote currency.

Practice: Repeat the example with a $25,000 account, 0.5% risk and a 2.5-unit stop. The base result should be 50 units before fees and instrument multipliers. What changes if expected slippage increases the per-unit loss? What happens when several correlated positions are open?

Open the Position Size Calculator ↗
03Understand reward, stops and partial exits

The familiar reward-to-risk ratio compares a prospective gain to a predefined loss. It is a description of a planned payoff, not a probability of success. A 3:1 target does not make a trade more likely to win. Conversely, a modest target is not automatically safer if the probability of loss, transaction costs or stop execution is misunderstood.

Worked example. Enter a fictional position at 100 with a stop at 95: planned price risk is five. A first target at 105 offers 1R; a second at 115 offers 3R. If half of the position exits at each target, the gross weighted target is 2R before costs and subject to the exit assumptions. If the second half stops out after the first exit, the outcome is different. A weighted average is not a guaranteed realized payoff.

Practice: Work out three outcomes: both targets filled, only first target filled with the remainder stopped, and immediate stop-out. Write the result in R for each case, then ask what fees and gap risk would change.

Explore Risk / Reward ↗
04Use volatility as context, not as a forecast

Average True Range (ATR) summarizes recent trading ranges, including gaps from the previous close. It does not indicate market direction or predict the maximum move tomorrow. Different data intervals produce different ATR readings, and a fast-moving market can behave very differently from its historical average. A stop chosen only from a multiple of ATR can still be hit during ordinary noise or a sudden market event.

Worked example. Suppose three fictional daily true ranges are 4, 6 and 5 price units. Their simple mean is 5, but Wilder's smoothing uses a specific recursive calculation after initialization. If a prior Wilder ATR is 5 with a 14-period setting and the next true range is 12, the updated ATR is (13 × 5 + 12) / 14 ≈ 5.50 units. This is context, not a certainty about future movement.

Practice: Compare a quiet period with an event-driven high-volatility period. Which assumptions need revision: the stop, the position size, the time horizon or the thesis itself? Document the data time frame and source.

Work with the ATR Calculator ↗
05Account for costs and the mathematics of recovery

A model with attractive gross payouts may lose its edge once spread, commission, financing and adverse fills are included. Treat costs as part of your planned risk before deciding whether a setup is worth researching further. Distinguish fixed costs per trade from costs depending on position size or holding time. Real execution can be worse than an illustrative model, particularly near gaps and illiquid periods.

Worked example. A plan has $100 price risk and $200 gross reward, with $8 estimated round-trip costs. The net win is $192, while a full stop becomes a $108 net loss. The break-even win rate under these two fixed outcomes is 108 / (192 + 108) = 36%. This result changes with costs and with the true outcome distribution. Separately, a 20% equity decline requires 25% growth to recover to the starting value, not 20%.

Practice: Increase estimated costs to $20 and recalculate the break-even win rate. Then consider a sequence of simultaneous stop-outs: which risks are independent, and which may move together under stress?

Test costs and break-even ↗
06Record results without inventing performance

A useful journal records what you believed before the outcome, then separately captures what actually happened. Include source dates, the risk budget, expected and actual costs, exit rules, mistakes and reasons for closing a trade. Never overwrite an old rationale with a later explanation. Separate hypothetical exercises, manually entered results and independently reconciled broker evidence.

Worked example. One hypothetical outcome of +1.88R followed by −1.00R gives a sum of +0.88R and a mean of +0.44R over two trades. A 50% win rate over two observations is far too little to establish a repeatable edge. The sequence drawdown is different from an account-equity drawdown: the latter requires actual sizing, deposits, fees, currencies and cash flows.

Practice: Enter three hypothetical results with distinct rationales, export the rows as CSV, import them back and identify what your sample cannot prove. Compare average net R, cost drag and the maximum decline in your indexed R series. Keep the sample size visible.

Review Journal Insights ↗

Your reusable research checklist

Use the seven questions before and after a hypothetical setup. Download it locally; no registration, tracking or browser storage is required.

Download the research checklist ↗

Course content is education, not individualized investment advice. Examples use invented scenarios and no verified live feed.

ACADEMY / FOUR ADVANCED RESEARCH PRACTICE LABS

Turn risk theory into repeatable research habits.

These are worked learning cases using fictional prices and assumptions, not backtests, market reports or trading recommendations. Each lab follows the same evidence → sizing → adverse scenario → review process so that learners can reproduce the arithmetic with the existing calculators.

LAB 01 Trend continuation: distinguish a thesis from a prediction

Research question. A fictional instrument has increased over several observation periods. What independent evidence would distinguish an established direction from a temporary rebound? Before calculating, document the observation timeframe, data source, relevant volatility and a falsifiable invalidation condition. Neither a rising illustration nor a chart pattern proves that continuation will occur.

Hypothetical numbers. Balance €12,000; risk budget 0.75% (€90); entry €50, stop €48, target €54; instrument unit has a verified assumed €1 value per €1 move; unit increment 1; round-trip fixed costs €6. Remaining price-risk allowance is €84. Dividing by the €2 stop distance gives 42 units. Planned stop loss is €90 (€84 + €6). Net target is €162 (€168 − €6), or 1.80R against planned stop.

Adverse case. An additional €0.50 fill difference adds €21; modeled stressed loss becomes €111. This exceeds the chosen budget, illustrating why the budget is a planning number, not a guaranteed loss ceiling.

Practice task

Write three specific observations that would disprove the trend thesis. Identify the original data source and a date to revisit it. Recalculate the result for €12 fees and explain what changed.

Show the arithmetic check

With fees of €12, the amount left for modeled price risk is €78: 78 ÷ 2 = 39 units. Planned stop is €90 (39 × €2 + €12); target gain after fees is €144 (39 × €4 − €12). Net planned reward-to-risk is 1.60R. These are not verified fills.

Reproduce in the Decision Case ↗
LAB 02 Breakout: separate a price threshold from evidence quality

Research question. A fictional price temporarily moves beyond a previously observed range. Does the source report a reliable observation, what constitutes a failed breakout, and what could be causing a temporary price spike? Establish the verification window, market session, source provenance and conditions that contradict the thesis before using a calculator.

Hypothetical numbers. $20,000 account, 0.5% planned risk ($100), entry 120, stop 117, target 126, $10 fixed round-trip costs, $1 point value per unit and unit step 1. Price risk available after costs is $90. At a three-point stop: 30 units. Modeled stop loss $100; target gain $170; net 1.70R.

Execution uncertainty. A one-point adverse fill adds $30 to this hypothetical position, taking the stress-case loss to $130. Higher slippage can invalidate the modeled risk boundary even when the thesis appears plausible.

Practice task

Draft a checklist for validating the range, the breakout observation and the source timestamp. Decide which missing evidence would make the result unreviewable. Do not equate a breakout description with a buy signal.

Show the arithmetic check

Budget = $20,000 × 0.005 = $100; available price risk = $90; quantity = floor($90 / $3) = 30; target net = 30 × $6 − $10 = $170. Extra one-point adverse fill = $30, so stressed model loss = $130.

Study trading costs ↗
LAB 03 Mean reversion: identify the assumptions behind a return to range

Research question. A fictional instrument moves away from a defined historical range. What makes the comparison meaningful? Range selection, volatility changes, market regime and outliers can all change interpretation. Define an explicit observation that would reject the reversion thesis instead of retrospectively moving the range.

Hypothetical short scenario. Account £8,000, budget 1% (£80), entry 200, stop 204, target 192, fees £8, point value £1, step 1. Available price risk £72; 18 units of the illustrative contract. Planned stop £80; target gain £136; net planned reward-to-risk 1.70R.

Research limitations. A short sale might involve borrow, financing, leverage, liquidity and margin constraints that this model does not represent. A one-point gap allowance lifts the illustrative loss to £98, exceeding budget by £18.

Practice task

Compare two different range windows. Document why each was selected and whether an observed price lies outside a meaningful historical distribution. Explain why a single example cannot establish an edge.

Show the arithmetic check

£8,000 × 1% = £80; after £8 costs, £72 / 4 = 18 units. Target net is 18 × 8 − 8 = £136. Modeled stop is 18 × 4 + 8 = £80; extra one-point fill yields 18 × 5 + 8 = £98.

Evaluate expectancy assumptions ↗
LAB 04 Event risk: recognize when the calculation is not a loss limit

Research question. Around a fictional scheduled announcement, which data source publishes the event and revision time? What happens to liquidity, spread, trading halts or executable prices? Keep the anticipated event distinct from a verified market observation.

Hypothetical numbers. Account €5,000; 0.5% budget (€25); planned stop distance 1.5; costs €5; point value €1 per price unit per contract unit; increment 1. Available price risk €20; round down to 13 units. Planned modeled stop is €24.50.

Stress boundary. If the realized fill were 2.5 units beyond the planned stop, the model would show 13 × (1.5 + 2.5) + €5 = €57 of loss. The exceedance relative to the €25 budget is €32. Actual event-driven fills could be worse; the estimate cannot reliably bound total losses.

Practice task

Write down which missing market conditions make the cost model unusable, and how you would record the decision not to trust an estimate. Distinguish an unobserved event outcome from an actual, time-stamped observation.

Show the arithmetic check

Budget €25; €20 remains after fees. floor(€20 / 1.5) = 13 units; planned stop = 13 × 1.5 + 5 = €24.50. Hypothetical adverse fill adds 13 × 2.5 = €32.50; stressed loss €57, exceeding the €25 budget by €32.

Explore adverse-fill scenarios ↗

Use the same review template every time

Describe the thesis, independent evidence, counterfactual, instrument assumptions, costs, stress scenario, review date and later observation. Separate self-entered or fictional cases from verified executed outcomes. Do not rewrite an original thesis after seeing the result.

Open My Research Desk ↗
ADVANCED RESEARCH / FOR EXPERIENCED MARKET PARTICIPANTS

Go beyond beginner indicators.

Professional research is about uncertainty, execution, samples and reproducibility. These four original training notes are designed for self-assessment, not for following trade calls.

01 / MARKET MICROSTRUCTURE

A spread is a state variable, not a fixed fee.

A nominal 1.2-pip spread cannot be assumed to persist through releases or thin liquidity. Model the bid/ask side, expected execution depth, partial fills and the difference between a stop trigger and an executable price.

Research exercise: record the spread at observation time and after a volatility shock; recompute net expectancy under a doubled spread and one additional adverse fill increment. Mark the data source and its latency.

02 / PORTFOLIO INTERDEPENDENCE

Five small positions can be one large idea.

Correlated exposure can compound at regime transitions. Two positions with 1% independently budgeted losses are not diversified just because their tickers differ; overlapping factors and tail dependence matter.

Research exercise: identify shared currency, rate, commodity and market-beta factors. Stress simultaneous stop-outs plus a gap loss, then compare the total with your self-chosen ceiling.

03 / WALK-FORWARD VALIDATION

Out-of-sample does not mean future-proof.

Repeated parameter searches contaminate holdout sets. Define research and test periods in advance, track strategy revisions and separate simulation, forward demo and broker-reconciled outcomes. Include commissions and sample uncertainty.

Research exercise: document the number of variations tested; show chronological train/test splits and investigate sensitivity to doubled costs and poorer fills.

04 / REGIME-CONDITIONAL EXPECTANCY

An average can hide incompatible subgroups.

A +0.15R aggregate sample may be driven by a single market regime. Segment by volatility, session, signal family and holding period. Report sample sizes and confidence limits rather than implying that a small positive sample proves a trading edge.

Research exercise: calculate expected R separately in calm and high-volatility cohorts, with the same fee model. Flag fewer than 30 observations as a small sample, not as verified performance.

Independent provider research: Download the blank broker and trading-platform due-diligence worksheet (CSV). It contains no rankings, endorsements or partner links.

PUT THE RESEARCH TO WORK

Useful calculations, connected.

From an initial thesis to a bounded risk estimate, inspect the assumptions behind every number.

Risk disclosureFinancial products carry significant risk of loss. This site provides general research and education, not individual recommendations or trade execution.